Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Ampelovirus trivitis (Grapevine leaf roll-associated virus 3)

Please note: there are high levels of uncertainty associated with the risk scores for this pest.

This record was last updated on 27/07/2026

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest spreads to maximum extent

Pathway Assessed for Entry to UK

  • show / hide

Common Pathways

  • show / hide

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 3
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 27

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated non quarantine pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 3
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 18

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe Present Thought to occur in all wine-growing regions of the world
United Kingdom Present (Unknown Distribution) UK distribution very uncertain
North America Present Thought to occur in all wine-growing regions of the world
South America Present Thought to occur in all wine-growing regions of the world
Oceania Present Thought to occur in all wine-growing regions of the world
Africa Present Thought to occur in all wine-growing regions of the world
Asia Present Thought to occur in all wine-growing regions of the world
Central America Present Thought to occur in all wine-growing regions of the world

Type of Pest

  • Virus or Viroid

Host or Industry at Risk

  • show / hide

Major Hosts

  • Vitis L.
  • Vitis vinifera L.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated non quarantine pest

Actions Indicated

  • show / hide

Action

Statutory action in line with regulations

General Comments

Grapevine virus with a worldwide distribution and one of the main causes of grapevine leafroll disease. Sourcing certified virus-free stock should minimise the risk that this virus poses to the UK.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Presence and distribution within the UK

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution