Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Pseudips mexicanus

This record was last updated on 11/02/2025

Common Names

  • Monterey pine engraver

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Wood packaging material

Common Pathways

  • show / hide
  • Non-squared wood
  • Bark
  • Wood packaging material

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 4
Impact [1 - 5] 1
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 10

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest (as Scolytinae spp. (non-European))

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 4
Impact [1 - 5] 1
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 10

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Ireland Present (Limited) Outbreak in one area. Surveys ongoing.
North America
Mexico Present
Central America
Guatemala Present

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Pinus

Major Hosts

  • Pinus L.
  • Pinus albicaulis Engelm.
  • Pinus attenuata Lemm.
  • Pinus ayacahuite Ehrenb.
  • Pinus cembroides Zucc.
  • Pinus contorta Dougl. Ex Loud.
  • Pinus cooperi Blanco
  • Pinus flexilis James
  • Pinus hartwegii Lindley
  • Pinus jeffreyi Grev. & Balf./Murr.
  • Pinus lambertiana Dougl.
  • Pinus leiophylla Cham. & Schlecht./Schiede & Deppe
  • Pinus maximinoi H.E.Moore
  • Pinus montezumae Lamb.
  • Pinus muricata D.Don
  • Pinus oocarpa Schiede
  • Pinus patula Cham. & Schlecht.
  • Pinus pseudostrobus Lindl.
  • Pinus radiata D.Don

Threats to Protected Cultivation

  • N/A

Forest Tree Pests and Pathogens

  • Coniferous

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest (as Scolytinae spp. (non-European)). EPPO Alert.

Actions Indicated

  • show / hide

Action

Statutory action

General Comments

A scolytine beetle which feeds under the bark of pine trees. It is native to North America, and an outbreak was detected in Ireland in 2023, near Limerick. Pseudips mexicanus is largely a secondary pest of trees which are already declining or under attack from other pests.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

General lack of literature on this species

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest