Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Aphis nerii

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 23/04/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 03/08/2020

Common Names

  • Oleander aphid

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest spreads to maximum extent

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Soil/growing medium

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 2

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 2

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Italy Present
Spain Present
Portugal Present
Hungary Present
Greece Present
Malta Present
Poland Present (Limited)
United Kingdom Present (Limited)
Netherlands Present (Unknown Distribution)
North America
Mexico Present
United States Present
South America
Argentina Present
Peru Present
Venezuela Present
Oceania Present
Africa Present
Angola Present
Egypt Present
Asia
India Present
Iran Present
Japan Present
Lebanon Present
Pakistan Present
Philippines Present
Saudi Arabia Present
South Korea Present
Syria Present
Vietnam Present
Central America
Guadeloupe Present
Puerto Rico Present

Type of Pest

  • Insect (Hemiptera)

Host or Industry at Risk

  • show / hide

Apocynaceae

Major Hosts

  • Araujia sericifera Brot.
  • Asclepias L.
  • Asclepias curassavica L.
  • Asclepias syriaca L.
  • Carica papaya L.
  • Metaplexis japonica (Thunb.) Makino
  • Nerium oleander L.
  • Oxypetalum caeruleum (D.Don) Decne.
  • Phaseolus vulgaris L.
  • Stephanotis floribunda Brongn.
  • Vinca L.
  • Dregea sinensis
  • Apocynaceae (family)

Threats to Protected Cultivation

  • Only protected crops

Forest Tree Pests and Pathogens

Further Information

PRA Availability

UK (2002), UK (2015)

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action on findings

General Comments

Polyphagous aphid pest unlikely to cause damage in the UK.

Risk Records for this Pest