Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Nacobbus aberrans sensu lato

This record was last updated on 23/03/2020

Common Names

  • False root-knot nematode

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Bulbs or tubers
  • Fruits or vegetables
  • Soil/growing medium

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 1
Impact [1 - 5] 4
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 12
UK Relative Risk Rating [1 - 125] 60

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 4
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 8
UK Relative Risk Rating [1 - 125] 40

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
United States Present (Limited)
Mexico Present (Limited)
South America Present
Peru Present (Limited)
Argentina Present (Widespread)
Chile Present
Bolivia Present (Limited)
Ecuador Present (Limited)

Type of Pest

  • Nematode (Tylenchida)

Host or Industry at Risk

  • show / hide

Total outdoor production

Major Hosts

  • Beta vulgaris L.
  • Brassica oleracea L.
  • Cactaceae
  • Capsicum L.
  • Capsicum annuum L.
  • Cucumis sativus L.
  • Cucurbitaceae (family)
  • Daucus carota subsp. sativus
  • Lactuca sativa L.
  • Solanum lycopersicum L.
  • Mammillaria vivipara (Nutt.) Haw.
  • Opuntia Mill.
  • Phaseolus vulgaris L.
  • Solanum L.
  • Solanum tuberosum L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest. EPPO A1

Actions Indicated

  • show / hide

Action

Statutory action against findings.

General Comments

Regulated nematode pest, present largely in the Americas. Regulation helps to mitigate the risk.

Risk Records for this Pest