Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Wheat dwarf virus

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 16/09/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 16/09/2020

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest spreads to maximum extent

Pathway Assessed for Entry to UK

  • show / hide

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Natural spread

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Bulgaria Present
Czech Republic Present
Finland Present
France Present
Germany Present
Hungary Present
Italy Present
Poland Present
Romania Present
Slovakia Present
Spain Present
Sweden Present
Ukraine Present
Türkiye Present
United Kingdom Present (Unknown Distribution)
Austria Present
Africa
Tunisia Present
Zambia Present
Asia
Syria Present
China Present
Iran Present

Type of Pest

  • Virus or Viroid

Host or Industry at Risk

  • show / hide

Cereals

Major Hosts

  • Apera spica-venti (L.) Beauv.
  • Avena fatua L.
  • Avena sativa L.
  • Avena sterilis Linnaeus
  • Bromus inermis Leyss.
  • Bromus secalinus L.
  • Bromus tectorum L.
  • Hordeum murinum L.
  • Hordeum vulgare L. em. Lam.
  • Lagurus ovatus L.
  • Lolium multiflorum Lam.
  • Lolium temulentum Linnaeus
  • Poa annua L.
  • Poa pratensis L.
  • Secale cereale L.
  • x Triticosecale
  • Triticum aestivum L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

UK (2015)

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings

General Comments

Wheat dwarf virus is widespread in Europe and present in low levels in the UK. Stakeholders may wish to monitor for the leafhopper vector and consider control options, to prepare for the possibility of further findings.

Risk Records for this Pest