UK Risk Register Details for Psilenchus spp.

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 06/07/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 11/05/2022

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (with soil)

Common Pathways

  • show / hide
This section is currently being developed as part of the next phase of the Risk Register.

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 1
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 1
UK Relative Risk Rating [1 - 125] 1

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 1
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 1
UK Relative Risk Rating [1 - 125] 1

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Present (Unknown Distribution)
North America Present
South America Present
Oceania Present
Africa Present
Asia Present

Type of Pest

  • Nematode (Tylenchida)

Host or Industry at Risk

  • show / hide

Total outdoor production

Major Hosts

  • Fragaria L.
  • Medicago sativa L.
  • Pistacia L.
  • Polianthes tuberosa L.
  • Secale cereale L.
  • Solanum L.
  • Tulipa L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

UK (1999)

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action in Great Britain

General Comments

No clear evidence that this genus of nematodes are plant pests. Used as an indicator to see if soil requirements have been met.

Risk Records for this Pest