UK Risk Register Details for Globodera tabacum sensu lato

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 23/07/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 23/07/2020

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
This section is currently being developed as part of the next phase of the Risk Register.

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 3
Value at Risk [1 - 5] 2
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 12

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 3
Value at Risk [1 - 5] 2
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 12

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
United States Present (Limited)
Canada Present
Mexico Present
South America
Argentina Present
Colombia Present
Africa
Madagascar Present
Morocco Present
Asia
China Present
Japan Present
South Korea Present
Pakistan Present

Type of Pest

  • Nematode (Tylenchida)

Host or Industry at Risk

  • show / hide

Organic Solanum lycopersicum

Major Hosts

  • Atropa belladonna L.
  • Capsicum annuum L.
  • Hyoscyamus niger L.
  • Solanum lycopersicum L.
  • Nicandra physalodes (L.) Gaertn./Pers.
  • Nicotiana acuminata (R.C.Grab.) Hook.
  • Nicotiana rustica L.
  • Nicotiana sanderae (N. x sanderae) Hort., Sander Ex W.Wats.
  • Nicotiana Linnaeus
  • Nicotiana tabacum L.
  • Solanum anguivi Lam.
  • Solanum gilo Raddi
  • Solanum mauritianum Scop.
  • Solanum melongena L.
  • Solanum nigrum L.
  • Solanum quitoense Lam.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

Further Information

PRA Availability

UK (2014)

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings

General Comments

Nematode pest of aubergine and tobacco present in some European countries and elsewhere. Existing restrictions relating to solanaceous crops on soil help to mitigate the risk of introduction from outside Europe.