UK Risk Register Details for Pratylenchus mediterraneus

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 04/08/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 04/08/2020

Common Names

  • Root lesion nematode

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Fruits or vegetables

Common Pathways

  • show / hide
  • Fruits or vegetables
  • Soil/growing medium

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Cyprus Present
Turkey Present
Africa
Algeria Present
Tunisia Present
Morocco Present
Asia
Israel Present
Syria Present

Type of Pest

  • Nematode (Tylenchida)

Host or Industry at Risk

  • show / hide

Solanum tuberosum

Major Hosts

  • Daucus carota L.
  • Olea europaea Linnaeus
  • Sesamum L.
  • Solanum tuberosum L.
  • Triticum aestivum L.
  • Vicia sativa L.
  • Vitis vinifera ssp. vinifera L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

UK (2005)

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings.

General Comments

Nematode pest from Mediterranean regions, not likely to establish in the UK.