UK Risk Register Details for Elatichrosis castanea

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 16/07/2021, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 16/07/2021

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Fruits or vegetables

Common Pathways

  • show / hide
This section is currently being developed as part of the next phase of the Risk Register.

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 10

Current Mitigations

  • show / hide

Key mitigation for pest

Prohibition of key pathway

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 10

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
United States Present (Limited) California, Hawaii
Oceania
New Zealand Present

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Solanum tuberosum

Major Hosts

  • Solanum tuberosum L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

UK (1995)

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action

General Comments

Minor wireworm (beetle) pest of potatoes in New Zealand. Main pathways for entry already regulated.