Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Crinivirus ipomeae (Sweet potato chlorotic stunt virus)

Please note: there are high levels of uncertainty associated with the risk scores for this pest.

This record was last updated on 27/07/2026

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Bulbs or tubers

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Bulbs or tubers
  • Cut flowers or branches
  • insect vectors

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 3
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 1
UK Relative Risk Rating [1 - 125] 1

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest (Great Britain). Main vector is regulated.

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 3
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 1
UK Relative Risk Rating [1 - 125] 1

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Spain Present (Limited) Canary Islands
Netherlands Present in specific parts of the Member State, where host crop(s) are grown.
Belgium Absent Pest eradicated
Portugal Present (Limited) Under eradication
Hungary Present
Greece Present
North America
United States Present
South America
Peru Present
Argentina Present
Brazil Present
Africa
Egypt Present
Ethiopia Present
Kenya Present
Madagascar Present
Nigeria Present
Rwanda Present
Tanzania Present
Uganda Present
Zambia Present
Asia
China Present
Israel Present
South Korea Present
Taiwan Present
Central America
Costa Rica Present
Guatemala Present
Honduras Present

Type of Pest

  • Virus or Viroid

Host or Industry at Risk

  • show / hide

Ipomoea batatas

Major Hosts

  • Ipomoea batatas (L.) Poir./Lam.
  • Plants (general)

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest (Great Britain)

Actions Indicated

  • show / hide

Action

Statutory action in line with legislation

General Comments

Sub-tropical virus affecting sweet potatoes, unlikely to establish outside in UK. Host crop not widely grown in the UK, although it is becoming more popular, with some protected cultivation.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Rapid addition via a workshop. Some areas of assessment may require more research.

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution