UK Risk Register Details for Ips hauseri

This record was last updated on 30/04/2020

Common Names

  • Hauser's engraver
  • Kyrgyz mountain engraver

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Wood packaging material (with bark)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches
  • Non-squared wood
  • Wood packaging material

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 45

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Russia Present (Limited)
Asia
China Present (Limited)
Kazakhstan Present
Kyrgyzstan Present
Tajikistan Present

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Pinus

Major Hosts

  • Larix Mill.
  • Larix sibirica (Muenchh.) Ledeb.
  • Picea A.Dietr.
  • Picea schrenkiana Fisch. & Mey.
  • Pinus L.
  • Pinus nigra ssp. pallasiana Arn.
  • Pinus sylvestris Linnaeus

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

  • Coniferous

Further Information

PRA Availability

UK (2016)

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest (as Scolytidae spp. (non European)). EPPO A2

Actions Indicated

  • show / hide

Action

Statutory action against findings

General Comments

Regulated beetle pest of conifers. Some uncertainty about the potential to establish and reach damaging population levels in the UK, but regulation helps to mitigate the risk of entry.

Risk Records for this Pest