UK Risk Register Details for Nipponorthezinella guadalcanalia

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 21/04/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 03/08/2020

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest spreads to maximum extent

Pathway Assessed for Entry to UK

  • show / hide

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 2

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 2

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Present (Unknown Distribution)
North America
United States Present
Oceania
Australia Present
Micronesia Present
New Caledonia Present
Palau Present
Papua New Guinea Present
Solomon Islands Present
Tonga Present
Vanuatu Present
Africa
Reunion Present
Seychelles Present
Asia
Indonesia Present
Taiwan Present
Central America
Guadeloupe Present

Type of Pest

  • Insect (Hemiptera)

Host or Industry at Risk

  • show / hide

Botanical collections

Major Hosts

  • Alpinia Roxb.
  • Amomum L.
  • Dorstenia L.
  • Plants (general)

Threats to Protected Cultivation

  • Only protected crops

Forest Tree Pests and Pathogens

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings

General Comments

Scale found in botanical collections, unlikely to pose a threat to UK plant health.