Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Peronospora belbahrii

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 24/06/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 24/06/2020

Common Names

  • Downy mildew

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest spreads to maximum extent

Pathway Assessed for Entry to UK

  • show / hide

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Seeds
  • Fruits or vegetables

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 1
Value at Risk [1 - 5] 2
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 4

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 1
Value at Risk [1 - 5] 2
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 4

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Present (Unknown Distribution)
Italy Present
Hungary Present
North America
United States Present
South America
Argentina Present
Africa
Cameroon Present
South Africa Present
Asia
Iran Present
Taiwan Present
China Present

Type of Pest

  • Oomycete

Host or Industry at Risk

  • show / hide

Ocimum basilicum

Major Hosts

  • Agastache Clayt. Ex Gronov.
  • Ocimum L.
  • Ocimum basilicum L.
  • Solenostemon scutellarioides (Linnaeus) Codd

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

Further Information

PRA Availability

UK (2012)

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings.

General Comments

Omycete of basil and other hosts, Identified by RHS. Consultation on PRA concluded no statutory action should be taken.