Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Potyvirus capsivenamaculae (Chilli veinal mottle virus)

This record was last updated on 23/07/2026

Common Names

  • Chilli veinal mottle virus

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 4
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 27

Current Mitigations

  • show / hide

Key mitigation for pest

Prohibition of key pathway. Regulated quarantine pest (Great Britain).

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 4
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 18

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Italy Present (Limited) Under eradication in glasshouse
Africa
Tanzania Present
Uganda Present
Asia
China Present
India Present
Indonesia Present
Malaysia Present
North Korea Present
Pakistan Present
Philippines Present
South Korea Present
Sri Lanka Present
Taiwan Present
Thailand Present
Vietnam Present

Type of Pest

  • Virus or Viroid

Host or Industry at Risk

  • show / hide

Protected Solanaceae

Major Hosts

  • Buddleia crispa Benth. Ex Wall.
  • Capsicum L.
  • Capsicum annuum L.
  • Capsicum baccatum var. baccatum L.
  • Capsicum chinense Jacq./L.
  • Capsicum frutescens L.
  • Commelina L.
  • Datura innoxia Mill.
  • Solanum lycopersicum L.
  • Mirabilis jalapa L.
  • Nicotiana tabacum L.
  • Physalis floridana Rydb. In Small
  • Solanum aethiopicum L./Torner
  • Solanum nigrum L.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

UK (2022)

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest (Great Britain)

Actions Indicated

  • show / hide

Action

Statutory action against findings in Great Britain

General Comments

Virus of solanaceous plants, particularly pepper, native to Asia, but detected elsewhere including Italy. Import requirements for solanaceous plants help to mitigate the risk of introduction from outside Europe.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

If the pest has been completely eradicated in Italy or is still present in a restricted distribution

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution