Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Bactericera cockerelli

This record was last updated on 10/03/2026

Common Names

  • potato psyllid
  • tomato psyllid

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced with the pathogen

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Fruits or vegetables

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Fruits or vegetables

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 3
Impact [1 - 5] 5
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 15
UK Relative Risk Rating [1 - 125] 75

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest and prohibition of key pathway

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 3
Impact [1 - 5] 5
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 15
UK Relative Risk Rating [1 - 125] 75

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
United States Present
Mexico Present
South America
Ecuador Present
Colombia Present
Peru Present
Oceania
New Zealand Present
Australia Present
Central America
Guatemala Present
Honduras Present
El Salvador Present
Nicaragua Present

Type of Pest

  • Insect (Hemiptera)

Host or Industry at Risk

  • show / hide

Solanum tuberosum

Major Hosts

  • Capsicum annuum L.
  • Ipomoea batatas (L.) Poir./Lam.
  • Lycium L.
  • Solanum lycopersicum L.
  • Mentha L.
  • Micromeria Benth.
  • Nepeta L.
  • Nicotiana tabacum L.
  • Solanum melongena L.
  • Solanum tuberosum L.
  • Solanaceae (family)

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

EPPO (2012), UK (2014)

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest. EPPO A1

Actions Indicated

  • show / hide

Action

Statutory action against findings.

General Comments

A psyllid vector of the bacterium which causes zebra chip (Candidatus Liberibacter solanacearum), a potentially serious pest of solanaceous hosts. Regulation prevents introduction or spread of the vector insect.

Risk Records for this Pest