UK Risk Register Details for Neofusicoccum parvum

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 26/05/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 26/05/2020

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest spreads to maximum extent

Pathway Assessed for Entry to UK

  • show / hide

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches
  • Fruits or vegetables

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Present (Unknown Distribution)
Greece Present
Italy Present
Spain Present
France Present
Portugal Present
Switzerland Present
North America
United States Present
Mexico Present
South America
Uruguay Present
Chile Present
Brazil Present
Venezuela Present
Oceania
New Zealand Present
Australia Present
Africa
[Kingdom of] eSwatini Present
South Africa Present
Algeria Present
Ethiopia Present
Uganda Present
Asia
Iran Present
India Present
China Present
South Korea Present
Thailand Present
Taiwan Present
Japan Present

Type of Pest

  • Fungus

Host or Industry at Risk

  • show / hide

Broadleaved trees, Vitis vinifera

Major Hosts

  • Araucaria heterophylla (Salisb.) Franco
  • Castanea sativa Mill.
  • Eucalyptus L'Herit.
  • Juglans
  • Lilium lancifolium Thunberg
  • Malus Mill.
  • Olea L
  • Persea americana Mill.
  • Populus nigra L.
  • Protea L.(1771, Non 1753)
  • Prunus persica Batsch
  • Pyrus L.
  • Quercus suber L.
  • Vaccinium L.
  • Vitis vinifera ssp. sylvestris L.
  • Citroncirus
  • Actinidia deliciosa (A. Chev.) Liang & A.R. Ferg.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

  • Broadleaved

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings.

General Comments

A pest of woody hosts that has been intercepted in the UK and which is thought to be present here (with an unknown distribution). Widespread globally with limited impacts.