UK Risk Register Details for Heterodera elachista

This record was last updated on 13/08/2021

Common Names

  • Japanese cyst nematode
  • Japanese rice cyst nematode

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Soil/growing medium

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Soil/growing medium
  • Agricultural machinery

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Current Mitigations

  • show / hide

Key mitigation for pest

Prohibition on key pathways from Asia

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Italy Present (Limited)
United Kingdom Absent
Asia
Japan Present
Iran Present
China Present

Type of Pest

  • Nematode (Tylenchida)

Host or Industry at Risk

  • show / hide

Triticum, Zea mays

Major Hosts

  • Echinochloa crus-galli (L.) P.Beauv.
  • Oryza sativa L.
  • Triticum L.
  • Zea mays L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

(Previously: EPPO Alert, removed 2019)

Actions Indicated

  • show / hide

Action

No statutory action

General Comments

Asian nematode pest of rice, maize and wheat, now present in Italy. Most likely to be moved with soil. Risk could be mitigated by measures on soil.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Pathway of introduction to Italy.

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest