UK Risk Register Details for Leucinodes ugandensis

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 16/04/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 16/04/2020

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Fruits or vegetables

Common Pathways

  • show / hide
This section is currently being developed as part of the next phase of the Risk Register.

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 3
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 1
UK Relative Risk Rating [1 - 125] 1

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 3
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 1
UK Relative Risk Rating [1 - 125] 1

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Africa
Ethiopia Present
Kenya Present
Somalia Present
South Sudan Present
Uganda Present

Type of Pest

  • Insect (Lepidoptera)

Host or Industry at Risk

  • show / hide

Protected Solanaceae

Major Hosts

  • Solanum L.

Threats to Protected Cultivation

  • Only protected crops

Forest Tree Pests and Pathogens

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings.

General Comments

Tropical African moth pest with no known interceptions. No experience of damage to protected cropping.