Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Thekopsora minima

This record was last updated on 11/08/2026

Common Names

  • leaf rust of blueberry

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest spreads to maximum extent

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 4
Spread [1 - 5] 3
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 12
UK Relative Risk Rating [1 - 125] 36

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated non quarantine pest (in Northern Ireland, as Pucciniastrum minimum)

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 3
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 27

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Spain Present (Limited)
Portugal Absent under eradication
Netherlands Present (Limited)
Germany Present (Limited)
United Kingdom Present Few occurrences
Belgium Absent Eradicated.
Sweden Absent Eradicated
North America
Canada Present
Mexico Present
United States Present (Limited)
South America
Brazil Present
Colombia Present
Oceania
New Zealand Present
Australia Present (Limited)
Africa
South Africa Present
Asia
Japan Present
China Present

Type of Pest

  • Fungus

Host or Industry at Risk

  • show / hide

Vaccinium

Major Hosts

  • Gaylussacia baccata (Wangenh.) K.Koch
  • Gaylussacia frondosa (L.) Torr. & Gray
  • Leucothoe D.Don
  • Lyonia ovalifolia (Wall.) Drude
  • Menziesia pilosa (Michx.) Juss.
  • Rhododendron canadense (L.) Torr.
  • Rhododendron canescens (Michx.) Sweet
  • Rhododendron lutescens Franch.
  • Rhododendron ponticum L.
  • Rhododendron prunifolium (Small) Millais
  • Rhododendron viscosum (L.) Torr.
  • Tsuga canadensis (L.) Carr.
  • Tsuga diversifolia (Maxim.) Mast.
  • Tsuga sieboldii Carr.
  • Vaccinium L.
  • Vaccinium angustifolium Ait.
  • Vaccinium ashei Reade
  • Vaccinium corymbosum L.
  • Vaccinium erythrocarpum Michx.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • Coniferous

Further Information

PRA Availability

EPPO (2017)

Regulation and EPPO listing

  • show / hide

Regulated non quarantine pest (in Northern Ireland, as Pucciniastrum minimum). EPPO A2

Actions Indicated

  • show / hide

Action

Statutory action against findings on specified host plants for planting

General Comments

Rust fungus affecting blueberry and hemlock. This fungus has been detected in parts of Europe including a limited number of sites in the UK. There is some uncertainty about the suitability of UK native host species.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Full host range including suitability of UK native plants.

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest