UK Risk Register Details for Hypocryphalus scabricollis

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 08/08/2019, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 07/04/2021

Common Names

  • A fig borer

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Non-squared wood
  • Bark

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 2
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 1
UK Relative Risk Rating [1 - 125] 1

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 2
Impact [1 - 5] 1
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 1
UK Relative Risk Rating [1 - 125] 1

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Malta Present
Italy Present
Africa
Tunisia Present
Asia
India Present
Sri Lanka Present
Bangladesh Present
Myanmar Present
Vietnam Present
China Present
Philippines Present

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Ficus

Major Hosts

  • Afzelia Sm.
  • Albizia chinensis (Osb.) Merr.
  • Bassia All.
  • Bombax ceiba L.
  • Buchanania lanzan Spreng.
  • Canarium L.
  • Excoecaria agalloche L.
  • Ficus L.
  • Mesua ferrea L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

  • Broadleaved

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings

General Comments

Bark beetle killing fig trees in Italy and Malta but which is very unlikely to establish and cause damage in the UK.