UK Risk Register Details for Phytophthora fragariaefolia

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 21/04/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 21/04/2020

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 45

Current Mitigations

  • show / hide

Key mitigation for pest

Prohibition of pathway from Japan. Not reduced further due to unconfirmed risk from European imports.

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Poland Present
United Kingdom Absent
Asia
Japan Present

Type of Pest

  • Oomycete

Host or Industry at Risk

  • show / hide

Fragaria

Major Hosts

  • Fragaria ananassa (F. x ananassa) Duch.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings.

General Comments

Pathogen which causes crown rot in strawberry, reported from Japan and Poland. Certification requirements can help to mitigate the impacts.