Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Xiphinema chambersi

This record was last updated on 20/07/2022

Common Names

  • Dagger nematode

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (with soil)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Bulbs or tubers
  • Soil/growing medium

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Current Mitigations

  • show / hide

Key mitigation for pest

Prohibition of key pathways

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
Canada Present
United States Present
Asia
Japan Present
South Korea Present

Type of Pest

  • Nematode (Dorylaimida)

Host or Industry at Risk

  • show / hide

Most outdoor trees and plants

Major Hosts

  • Abies holophylla Maxim.
  • Camellia sinensis (L.) O.Kuntze
  • Cynodon dactylon (L.) Pers.
  • Deciduous trees
  • Fagus grandifolia Ehrh.
  • Fragaria L.
  • Fraxinus americana L.
  • Ligustrum japonicum Thunb.
  • Liquidambar styraciflua L.
  • Pinus densiflora Sieb. & Zucc.
  • Prunus virginiana L.
  • Quercus acutissima Carruth.
  • Quercus palustris Muenchh./Du Roi
  • Quercus phillyraeoides Gray
  • Quercus rubra L.
  • Quercus stenophyla (Blume) Makino
  • Quercus virginiana Mill.
  • Tsuga canadensis (L.) Carr.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • Broadleaved & Coniferous

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

Maintain a watching brief

General Comments

Nematode pest moving in trade. Present in parts of North America and Asia. Import restrictions on soil and growing media provide some mitigation against risk of introduction.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Full host range and geographical distribution

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest