Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Ralstonia pseudosolanacearum

This record was last updated on 23/09/2026

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Plants for planting (with soil)

Common Pathways

  • show / hide
  • Bulbs or tubers
  • Cut flowers or branches
  • Fruits or vegetables
  • Soil/growing medium
  • Plant waste
  • water

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 4
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 45

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 4
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 45

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Germany Present (Limited) under eradication
Greece Present (Limited) under official control
Netherlands Present under surveillance
Switzerland Present (Limited) under eradication
Slovenia Present (Limited) under eradication
Hungary Present
United Kingdom Absent
North America
Canada Absent eradicated
United States Present
Mexico Present
South America
Peru Present
Brazil Present
Oceania
Papua New Guinea Present
New Caledonia Present
Africa
Angola Present
Mauritius Present
Reunion Present
Zimbabwe Present
Kenya Present
Congo (Democratic Rep.) Present
Uganda Present
South Africa Present
Asia
Cambodia Present
Sri Lanka Present
Philippines Present
Thailand Present
China Present
Indonesia Present
Laos Present
South Korea Present
Central America
Costa Rica Present

Type of Pest

  • Bacterium

Host or Industry at Risk

  • show / hide

Rose and other ornamentals, solanaceous crops (particularly those under glass)

Major Hosts

  • Arachis hypogaea L.
  • Capsicum annuum L.
  • Cicer arietinum L.
  • Curcuma longa L.
  • Eucalyptus L'Herit.
  • Helianthus L.
  • Luffa aegyptiaca Mill.
  • Solanum lycopersicum L.
  • Morus L.
  • Nicotiana tabacum L.
  • Olea europaea Linnaeus
  • Pelargonium capitatum L'Hrit. Ex Ait./Soland./Willd.
  • Rosa L.
  • Sesamum indicum L.
  • Solanum L.
  • Solanum dulcamara L.
  • Solanum melongena L.
  • Solanum tuberosum L.
  • Symphytum L.
  • Syzygium aromaticum (L.) Merr. & L.M.Perry
  • Zingiber Boehm.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest, EPPO A2

Actions Indicated

  • show / hide

Action

Statutory action against interceptions and outbreaks

General Comments

Bacterial pathogen of a wide range of hosts, including potato, tomato and rose. This bacterium is now known to survive winter in waterways in northern Europe. Therefore, it poses a potential risk to hosts grown in the UK.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Most likely pathway for entry, and impact on outdoor hosts in temperate regions

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest