UK Risk Register Details for Euwallacea fornicatior

This record was last updated on 21/09/2022

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Wood packaging material

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Non-squared wood
  • Wood packaging material
  • Hitchhiking
  • Firewood

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 18

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest (as "non-European Scolytidae spp.")

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 18

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Oceania
Micronesia Present
Papua New Guinea Present
Asia
China Present
India Present
Indonesia Present
Malaysia Present
Philippines Present
Singapore Present
Sri Lanka Present
Taiwan Present
Thailand Present

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Broadleaved trees

Major Hosts

  • Albizia (= Albizzia) Durazz.
  • Artocarpus altilis (Parkins.) Fosb.
  • Camellia sinensis (L.) O.Kuntze
  • Durio zibethinus Murr.
  • Tephrosia Pers.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

  • Broadleaved

Further Information

PRA Availability

[UK (2015) on a related species - NB before taxonomy of the species group was revised and clarified]

Regulation and EPPO listing

  • show / hide

Provisional quarantine pest (Great Britain), quarantine pest (Northern Ireland) (both as Euwallacea fornicatus sensu lato). Quarantine pest (as non-European Scolytidae spp.).

Actions Indicated

  • show / hide

Action

Statutory action against findings

General Comments

A disease complex involving an ambrosia beetle and fungus, native to Asia. Climate is likely to be a limiting factor regarding establishment in the UK. Watching brief needed for any pest spread into areas with cooler climates or movement onto a wider host range than currently recorded.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Repeated taxonomic revisions for the species group mean that older data often cannot be unambiguously assigned to a species.

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest