UK Risk Register Details for Aroga trialbamaculella

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 27/01/2022, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 27/01/2022

Common Names

  • Fireworm, red striped

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Fruits or vegetables

Common Pathways

  • show / hide
This section is currently being developed as part of the next phase of the Risk Register.

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 3
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 27

Current Mitigations

  • show / hide

Key mitigation for pest

Requirements for inspection of Vacciniumm fruit

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 3
Impact [1 - 5] 3
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 18

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
Canada Present
United States Present

Type of Pest

  • Insect (Lepidoptera)

Host or Industry at Risk

  • show / hide

Vaccinium

Major Hosts

  • Arbutus L.
  • Gaylussacia dumosa (Andr.) Torr. & Gray
  • Vaccinium L.
  • Vaccinium angustifolium Ait.
  • Vaccinium ashei Reade
  • Vaccinium caespitosum Michx.
  • Vaccinium corymbosum L.
  • Vaccinium stamineum L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action

General Comments

Moth pest of blueberry present in North America.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Whether larvae could survive packing and transport with fruit.

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution