Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Ips perturbatus

This record was last updated on 11/02/2025

Common Names

  • Northern spruce engraver
  • Spruce bark beetle

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Wood packaging material (with bark)

Common Pathways

  • show / hide
  • Non-squared wood
  • Wood packaging material

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 4
Impact [1 - 5] 4
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 12
UK Relative Risk Rating [1 - 125] 60

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest (as non-European Scolytinae). ISPM 15 on wood packaging material

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 4
Impact [1 - 5] 4
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
Canada Present
United States Present

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Picea sitchensis

Major Hosts

  • Picea glauca (Moench) Voss
  • Picea lutzii (P. x lutzii) Little
  • Picea mariana (Mill.) Britt., Sterns & Poggenb.
  • Picea sitchensis (Bong.) Carr.

Threats to Protected Cultivation

  • N/A

Forest Tree Pests and Pathogens

  • Coniferous

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest (as non-European Scolytinae)

Actions Indicated

  • show / hide

Action

Statutory action in line with the existing regulation of all non-European Scolytinae. Further regulation is not considered appropriate as the main pathways for entry of I. perturbatus are either prohibited or effectively regulated.

General Comments

North American bark beetle which attacks spruce. As with many bark beetles, highest impacts are seen on trees which are already stressed. Existing requirements on wood, wood packaging material, and prohibitions on growing plants mitigate the risk of entry into the UK.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Level of impacts seen on hosts of significance to the UK.

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest