UK Risk Register Details for Pseudomonas viridiflava

This record was last updated on 31/12/2020

Common Names

  • bacterial leaf blight of tomato (USA)
  • bacterial leaf necrosis of basil (USA)
  • bacterial rot of Chinese cabbage (Korea Republic)
  • bacterial rot of lettuce (Korea Republic)
  • bacterial soft rot of tomato (USA, Crete)
  • Blight, bacterial: kiwi
  • Greasy canker: poinsettia
  • Hydrangea bud blight (USA)
  • Root rot: alfalfa

Scenario and Pathways

Scenario for Risk Register

  • show / hide

Pathway Assessed for Entry to UK

  • show / hide

Common Pathways

  • show / hide

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5]
Spread [1 - 5]
Impact [1 - 5]
Value at Risk [1 - 5]
Likelihood x Impact [1 - 25]
UK Relative Risk Rating [1 - 125]

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5]
Spread [1 - 5]
Impact [1 - 5]
Value at Risk [1 - 5]
Likelihood x Impact [1 - 25]
UK Relative Risk Rating [1 - 125]

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Present (Widespread)
Belgium Present
Bulgaria Present
France Present
Germany Present
Greece Present
Hungary Present
Italy Present
Republic of North Macedonia Present
Montenegro Present
Netherlands Present
Poland Present
Portugal Present
Russia Present
Serbia Present
Slovakia Present
Spain Present
Sweden Present
Switzerland Present
Turkey Present
North America
United States Present
South America
Argentina Present
Brazil Present
Uruguay Present
Venezuela Present
Oceania
Australia Present
New Zealand Present
Africa
Algeria Present
Egypt Present
Kenya Present
Morocco Present
Tanzania Present
Uganda Present
Asia
China Present
Iran Present
Japan Present
Jordan Present
Nepal Present
Saudi Arabia Present
South Korea Present

Type of Pest

  • Bacterium

Host or Industry at Risk

  • show / hide

Major Hosts

  • Allium cepa L.
  • Anethum graveolens L.
  • Apium graveolens L.
  • Capsicum annuum L.
  • Cucumis melo L.
  • Cucumis sativus L.
  • Cucurbita maxima Duch.
  • Hydrangea L.
  • Solanum lycopersicum L.
  • Prunus armeniaca L.
  • Actinidia deliciosa (A. Chev.) Liang & A.R. Ferg.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated non quarantine pest

Actions Indicated

  • show / hide

Action

No current Actions Indicated

General Comments

The Risk Register entry for this pest is extremely incomplete and it cannot be compared with other pests on the Risk Register at the current time. As this is a Regulated Non Quarantine Pest (RNQP) listed in the legislation, we are making available the information we have gathered on the pest so far. It is possible that we will add new information to this pest entry in due course, but as there are a great many RNQPs this may take some time.

Risk Records for this Pest