Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Liriomyza sativae

This record was last updated on 25/07/2023

Common Names

  • American leaf miner
  • chrysanthemum leaf miner
  • melon leaf miner
  • serpentine vegetable leaf miner
  • vegetable leaf miner

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Fruits or vegetables

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches
  • Fruits or vegetables

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 5
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 10
UK Relative Risk Rating [1 - 125] 50

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Türkiye Present
United Kingdom Absent
Malta Present
North America
Canada Present
Mexico Present
United States Present
South America
Ecuador Present
Argentina Present
Brazil Present
Chile Present
Colombia Present
French Guiana Present
Peru Present
Venezuela Present
Oceania
Australia Present
Papua New Guinea Present
French Polynesia Present
Micronesia Present
New Caledonia Present
Samoa Present
Vanuatu Present
Africa
Cameroon Present
Egypt Present
Kenya Present
Nigeria Present
Sudan Present
Zimbabwe Present
Asia
United Arab Emirates Present
Iraq Present
Pakistan Present
Philippines Present
Saudi Arabia Present
China Present
India Present
Indonesia Present
Iran Present
Israel Present
Japan Present
Jordan Present
Malaysia Present
Oman Present
Sri Lanka Present
Thailand Present
Uzbekistan Present
Vietnam Present
Yemen Present
Bangladesh Present
Central America
Guatemala Present
Honduras Present
Antigua and Barbuda Present
Bahamas Present
Barbados Present
Cuba Present
Costa Rica Present
Dominica Present
Dominican Republic Present
Guadeloupe Present
Jamaica Present
Martinique Present
Nicaragua Present
Panama Present
Puerto Rico Present
Saint Lucia Present
Saint Kitts and Nevis Present
Saint Vincent and the Grenadines Present
Trinidad and Tobago Present

Type of Pest

  • Insect (Diptera)

Host or Industry at Risk

  • show / hide

Solanum

Major Hosts

  • Apium graveolens L.
  • Aster novi-belgii L.
  • Capsicum annuum L.
  • Chrysanthemum L.
  • Cucumis L.
  • Cucumis melo L.
  • Cucumis sativus L.
  • Cucurbita pepo L.
  • Dahlia hybrids
  • Chrysanthemum x morifolium Ramat.
  • Dianthus L.
  • Gypsophila L.
  • Lathyrus L.
  • Solanum lycopersicum L.
  • Medicago sativa L.
  • Ocimum L.
  • Phaseolus lunatus L.
  • Phaseolus vulgaris L.
  • Pisum sativum Linnaeus
  • Ricinus communis L.
  • Solanum melongena L.
  • Solanum tuberosum L.
  • Solidago L.
  • Sorghum vulgare Pers.
  • Spinacia oleracea L.
  • Vicia faba L.
  • Vigna Savi
  • Solanaceae (family)
  • Fabaceae (family)
  • Plants (general)

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest. EPPO A2

Actions Indicated

  • show / hide

Action

Statutory action against findings.

General Comments

Regulated quarantine leafmining fly pest. Intercepted frequently on plant produce, but no recent outbreaks in the UK. Still spreading internationally.

Risk Records for this Pest