Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Matsucoccus matsumurae

Please note: there are high levels of uncertainty associated with the risk scores for this pest.

This record was last updated on 16/06/2026

Common Names

  • Japanese pine bast scale
  • red pine scale

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches
  • Non-squared wood

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 3
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 45

Current Mitigations

  • show / hide

Key mitigation for pest

Prohibition on hosts (other than those permitted under bonsai derogation)

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 3
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
United States Present
Asia
South Korea Present
China Present
Japan Present

Type of Pest

  • Insect (Hemiptera)

Host or Industry at Risk

  • show / hide

Pinus

Major Hosts

  • Pinus densiflora Sieb. & Zucc.
  • Pinus kesiya Royle Ex Gordon
  • Pinus luchuensis Mayr
  • Pinus massoniana Lamb.
  • Pinus resinosa Ait./Soland.
  • Pinus tabulaeformis Carriere
  • Pinus taiwanensis Hayata
  • Pinus thunbergii Parl.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

  • Coniferous

Further Information

PRA Availability

EFSA pest categorisation (2024)

Regulation and EPPO listing

  • show / hide

Northern Ireland: included in EU derogation 2024/2852.

Actions Indicated

  • show / hide

Action

Statutory action on a case by case basis

General Comments

Asian scale insect affecting particular species of pine trees. It has been introduced to China and the USA, where it is causing high levels of damage to susceptible pines. Taxonomic studies need to be done to determine if the Matsucoccus species present in the UK and Europe is the same species as the one found in Asia.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Whether the European species Matsucoccus pini is a synonym of M. matsumurae

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest