Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Orchidophilus spp.

This record was last updated on 17/09/2026

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 2
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 8

Current Mitigations

  • show / hide

Key mitigation for pest

Provisional quarantine pest (Great Britain).

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 2
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 8

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
United States Present (Limited)
Oceania
New Caledonia Present
Solomon Islands Unknown Species identification unverified
Papua New Guinea Present
Australia Present (Limited)
Samoa Present
Asia
Japan Present
Indonesia Present
Malaysia Present
Singapore Present
Philippines Present
Taiwan Present
Thailand Present

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Orchidaceae

Major Hosts

  • Aerides Lour.
  • Angraecum Bory
  • Bulbophyllum Thou.
  • Catasetum (Kunth) L.C.Rich.
  • Cattleya Lindl.
  • Coelogyne Lindl.
  • Cymbidium Sw.
  • Cypripedium L.
  • Dendrobium Sw.
  • Epidendrum L.
  • Liparis L.C.Rich.
  • Oncidium Sw.
  • Paphiopedilum Pfitz.
  • Phalaenopsis Blume
  • Phalaenopsis amabilis (L.) Blume
  • Phalaenopsis schilleriana Reichb.F.
  • Renanthera Lour.
  • Rhynchostylis retusa (L.) Blume
  • Spathoglottis Blume
  • Vanda Jones Ex R.Br.
  • Orchidaceae (family)

Threats to Protected Cultivation

  • Only protected crops

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

UK (2026)

Regulation and EPPO listing

  • show / hide

Provisional quarantine pest (Great Britain).

Actions Indicated

  • show / hide

Action

No statutory action. While still currently regulated as a provisional quarantine pest, recent risk assessments of this pest have determined that the risk to the UK is lower than previously concluded.

General Comments

A group of orchid-feeding weevils native to south-east Asia. High likelihood of establishment under protection, where damage to orchids would be expected. Site specific control methods such as quarantining and inspection of material is likely to limit spread.

Risk Records for this Pest