Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Dendrolimus sibiricus

This record was last updated on 10/03/2026

Common Names

  • Siberian lasiocampid
  • larch caterpillar
  • Siberian conifer silk moth
  • Siberian lappet moth
  • Siberian moth
  • Siberian silk moth

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Non-squared wood

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches
  • Non-squared wood
  • Bark
  • Hitchhiking

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 4
Spread [1 - 5] 4
Impact [1 - 5] 5
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 20
UK Relative Risk Rating [1 - 125] 100

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 4
Impact [1 - 5] 5
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 10
UK Relative Risk Rating [1 - 125] 50

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Russia Present
United Kingdom Absent
Asia Present
China Present
North Korea Present
South Korea Present
Kazakhstan Present
Mongolia Present
Russia Present

Type of Pest

  • Insect (Lepidoptera)

Host or Industry at Risk

  • show / hide

Forestry

Major Hosts

  • Abies Miller
  • Abies nephrolepis (Trautv.) Maxim.
  • Abies sachalinensis (Fr.Schm.) Mast.
  • Abies sibirica Ledeb.
  • Larix Mill.
  • Larix sibirica (Muenchh.) Ledeb.
  • Picea A.Dietr.
  • Picea jezoensis var. jezoensis (Sieb. & Zucc.) Carr.
  • Picea obovata Ledeb.
  • Pinus L.
  • Pinus koraiensis Sieb. & Zucc.
  • Pinus pumila (Pall.) Regel
  • Pinus sibirica Du Tour
  • Pseudotsuga menziesii (Mirbel) Franco
  • Tsuga Carr.
  • Larix gmelinii

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

  • Coniferous

Further Information

PRA Availability

EPPO (2000)

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest. EPPO A2

Actions Indicated

  • show / hide

Action

Statutory action against findings

General Comments

Serious moth pest of coniferous forests in Russia. Current prohibitions on hosts mitigate risk of introduction from areas where the pest is known to be established.

Risk Records for this Pest