Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Meloidogyne graminicola

This record was last updated on 11/08/2026

Common Names

  • Rice root-knot nematode
  • Root gall nematode
  • Root-knot nematode

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (with soil)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Bulbs or tubers
  • Soil/growing medium
  • Agricultural machinery

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest (Northern Ireland)

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Italy Present (Limited)
United Kingdom Absent
North America
United States Present
South America
Brazil Present
Colombia Present
Ecuador Present
Africa
Madagascar Present
South Africa Present
Asia
Bangladesh Present
China Present
India Present
Indonesia Present
Laos Present
Malaysia Present
Myanmar Present
Nepal Present
Pakistan Present
Philippines Present
Singapore Present
Sri Lanka Present
Thailand Present
Vietnam Present

Type of Pest

  • Nematode (Tylenchida)

Host or Industry at Risk

  • show / hide

food crops

Major Hosts

  • Allium cepa L.
  • Brassica juncea (L.) Czern.
  • Brassica napus L.
  • Brassica oleracea L.
  • Capsicum frutescens L.
  • Cucumis sativus L.
  • Cyperaceae (family)
  • Glycine max (L.) Merr.
  • Poaceae (family)
  • Lactuca sativa L.
  • Oryza sativa L.
  • Petunia Juss.
  • Phaseolus vulgaris L.
  • Pisum sativum Linnaeus
  • Solanum L.
  • Spinacia oleracea L.
  • Triticum aestivum L.
  • Vicia faba L.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest (Northern Ireland). EPPO A2

Actions Indicated

  • show / hide

Action

Statutory action in Northern Ireland

General Comments

Polyphagous nematode, with most impacts recorded on rice. Native to Asia, now found elsewehre including parts of Italy.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Suitability of UK soil conditions and impacts on hosts other than rice.

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest