Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Ovachlamys fulgens

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 27/07/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 27/07/2020

Common Names

  • Jumping snail

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 6

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 1
Impact [1 - 5] 2
Value at Risk [1 - 5] 1
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 6

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
United States Present (Limited)
South America
Colombia Present
Venezuela Present
Argentina Present
Brazil Present
Oceania
French Polynesia Present
Asia
Japan Present (Limited)
Thailand Present
Singapore Present
Central America
Nicaragua Present
Costa Rica Present
Trinidad and Tobago Present (Limited)

Type of Pest

  • Other

Host or Industry at Risk

  • show / hide

Orchidaceae, Botanical collections or Specialists

Major Hosts

  • Dracaena Vand. Ex L.
  • Heliconia L.
  • Mangifera L.
  • Persea americana Mill.
  • Orchidaceae (family)

Threats to Protected Cultivation

  • Only protected crops

Forest Tree Pests and Pathogens

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action against findings.

General Comments

Snail pest of orchids which is unlikely to establish outdoors in the UK, but orchid growers and botanic collectors may wish to monitor for its presence.

Risk Records for this Pest