Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Medythia nigrobilineata

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 03/07/2020, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 28/01/2026

Common Names

  • Two-striped leaf beetle

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Hitchhiking

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Hitchhiking

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 3
Impact [1 - 5] 2
Value at Risk [1 - 5] 2
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 4

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 3
Impact [1 - 5] 2
Value at Risk [1 - 5] 2
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 4

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Russia Present (Limited)
United Kingdom Absent
Asia
China Present
Japan Present
Nepal Present
Pakistan Present
Russia Present
South Korea Present

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Glycine max

Major Hosts

  • Glycine max (L.) Merr.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action

General Comments

Beetle pest of soybean, native to parts of Asia where it causes impacts on crops in Japan. A single adult has been detected in European Russia and the situation is being monitored for any further reports which may indicate a breeding population.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Whether the pest is established in European Russia

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution