Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Ralstonia syzygii subsp. indonesiensis

This record was last updated on 12/01/2021

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Fruits or vegetables

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches
  • Fruits or vegetables

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 2
Impact [1 - 5] 2
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 10

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
Oceania
Australia Present
Asia
India Present
Indonesia Present
South Korea Present
Philippines Present
Japan Present

Type of Pest

  • Bacterium

Host or Industry at Risk

  • show / hide

Solanum tuberosum

Major Hosts

  • Capsicum annuum L.
  • Solanum lycopersicum L.
  • Solanum L.
  • Solanum tuberosum L.

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest

Actions Indicated

  • show / hide

Action

Statutory action on interceptions and outbreaks

General Comments

Quarantine listed bacterial pathogen with a wide range of solanaceous hosts.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Climatic suitability of the UK

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution