Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Atherigona reversura

Pest has been archived

This pest has been assessed for the Risk Register and is considered to pose a low risk to the UK. The information on this pest was correct as of 05/03/2025, but is no longer actively maintained. It will only be updated if new information is received which indicates the potential for a significant increase in risk to the UK.

This record was last updated on 09/03/2025

Common Names

  • bermudagrass stem maggot

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Cut flowers or branches

Common Pathways

  • show / hide
  • Cut flowers or branches

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 4
Impact [1 - 5] 2
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 6

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 4
Impact [1 - 5] 2
Value at Risk [1 - 5] 3
Likelihood x Impact [1 - 25] 2
UK Relative Risk Rating [1 - 125] 6

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
Canada Present (Limited)
Mexico Present
United States Present
South America
Argentina Present
Brazil Present
Uruguay Present
Asia
Indonesia Present
Iran Present
China Present
India Present
Japan Present (Limited)
South Korea Present
Malaysia Present
Myanmar Present
Oman Present
Philippines Present
Saudi Arabia Present
Sri Lanka Present
Taiwan Present

Type of Pest

  • Insect (Diptera)

Host or Industry at Risk

  • show / hide

Bermudagrass, but can also feed on multiple Poaceae species

Major Hosts

  • Cynodon dactylon (L.) Pers.
  • Echinochloa colonum (= colona) (L.) Link
  • Eleusine coracana (L.) Gaertn.
  • Eriochloa procera (Retz.) C.E.Hubb.
  • Sehima nervosum (Rottl. Ex Willd.) Stapf

Threats to Protected Cultivation

  • N/A

Forest Tree Pests and Pathogens

  • N/A

Further Information

PRA Availability

PRA not available

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action

General Comments

Insect pest of bermudagrass, damaging the top leaves, resulting in growth reduction. While other Poaceae hosts have been reported, no impacts have been identified on these. Potential impacts for the UK are thought to be low.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

While there is a preference for bermudagrass, the host suitability of other Poaceae species has not been studied extensively.

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution