Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Trichoferus campestris

This record was last updated on 28/11/2022

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Wood packaging material
  • Wood packaging material (with bark)

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Non-squared wood
  • Squared wood
  • Wood packaging material
  • Hitchhiking
  • Manufactured plant products

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 45

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 9
UK Relative Risk Rating [1 - 125] 45

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
Czech Republic Present
Hungary Present
Lithuania Present
Moldova Present
Poland Present
Romania Present
Russia Present
Ukraine Present
Slovakia Present (Limited) Present, only in some parts of the Member State concerned, at low prevalence.
United Kingdom Absent
North America
Canada Present
United States Present
Asia
Armenia Present
Azerbaijan Present
Iran Present
Japan Present
Kazakhstan Present
Kyrgyzstan Present
Mongolia Present
North Korea Present
Russia Present
South Korea Present
Tajikistan Present
Turkmenistan Present
Uzbekistan Present
China Present
Georgia Present (Limited)

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Broadleaved trees

Major Hosts

  • Betula L.
  • Broussonetia L'Herit.
  • Fraxinus L.
  • Gleditsia L.
  • Malus Mill.
  • Malus domestica Borkhausen
  • Malus pumila Mill.
  • Morus L.
  • Morus alba L.
  • Populus L.
  • Pyrus pyrifolia (Burm.F.) Nakai
  • Robinia pseudoacacia L.
  • Salix L.
  • Sorbus L.
  • Ulmus L.

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

  • Broadleaved

Further Information

PRA Availability

UK (2014)

Regulation and EPPO listing

  • show / hide

EPPO A2

Actions Indicated

  • show / hide

Action

Statutory action against findings.

General Comments

Longhorn beetle from Asia, now present in Eastern Europe. It could potentially be a threat to ornamental and fruit trees if introduced to UK.

Risk Records for this Pest