Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Globodera rostochiensis Non-European Strains

This record was last updated on 08/11/2022

Common Names

  • Cyst nematode
  • Golden nematode
  • Golden potato cyst nematode
  • Nematode, potato cyst
  • Potato cyst nematode
  • Root nematode

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Bulbs or tubers

Common Pathways

  • show / hide
  • Bulbs or tubers
  • Fruits or vegetables
  • Soil/growing medium

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 3
Spread [1 - 5] 1
Impact [1 - 5] 4
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 12
UK Relative Risk Rating [1 - 125] 60

Current Mitigations

  • show / hide

Key mitigation for pest

Regulated quarantine pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 1
Spread [1 - 5] 1
Impact [1 - 5] 4
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 4
UK Relative Risk Rating [1 - 125] 20

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
United Kingdom Absent
North America
Canada Present (Limited) Not widely distributed and under official control.
Mexico Present (Limited)
United States Present (Limited)
South America
Falkland Islands Present
Bolivia Present
Chile Present
Colombia Present
Ecuador Present
Peru Present
Venezuela Present
Oceania
Australia Present (Limited)
New Zealand Present (Widespread)
Africa
Kenya Present
Uganda Present
Rwanda Present
Algeria Present
Egypt Present
Libya Present
South Africa Present
Tanzania Present
Tunisia Present
Asia
Kazakhstan Present
Kyrgyzstan Present
Pakistan Present
Georgia Present
China Present (Limited) Guizhou, Sichuan and Yunnan provinces.
Armenia Present
India Present
Indonesia Present
Iran Present
Japan Present (Limited)
Lebanon Present
Oman Present
Philippines Present
Sri Lanka Present
Tajikistan Present
Russia Present
Central America
Panama Present

Type of Pest

  • Nematode (Tylenchida)

Host or Industry at Risk

  • show / hide

Solanum tubersosum

Major Hosts

  • Allium cepa L.
  • Allium cepa var. aggregatum L.
  • Allium porrum L.
  • Asparagus officinalis L.
  • Beta vulgaris L.
  • Brassica L.
  • Capsicum L.
  • Dahlia Cav.
  • Fragaria L.
  • Gladiolus L.
  • Hyacinthus L.
  • Iris L.
  • Lilium L.
  • Solanum lycopersicum L.
  • Narcissus L.
  • Solanum L.
  • Solanum melongena L.
  • Solanum tuberosum L.
  • Tulipa L.
  • Plants (general)

Threats to Protected Cultivation

Forest Tree Pests and Pathogens

Further Information

PRA Availability

EFSA (2012)

Regulation and EPPO listing

  • show / hide

Regulated quarantine pest, EPPO A2

Actions Indicated

  • show / hide

Action

Statutory action against findings.

General Comments

Nematode pest, European populations of which are already present in UK. The main risk is new populations can be introduced with damaging impacts. Main pathways are prohibited which mitigate against this threat.