Our use of Cookies

This site uses only cookiesstrictly necessaryto ensure the site works correctly.

Please read about how we use cookies.

Hide this message

Strictly necessary and non-essential cookies

Accept all cookies

Accept necessary cookies only

Set Cookie Preferences

By clicking accept all cookies, you agree to our use of cookies and to our cookie policy.

We use third-party cookies on this site.

You have accepted necessary cookies only

You can change your cookie settings at any time

Hide this message

UK Risk Register Details for Listroderes difficilis

This record was last updated on 15/10/2025

Scenario and Pathways

Scenario for Risk Register

  • show / hide
  • Pest is introduced

Pathway Assessed for Entry to UK

  • show / hide
  • Fruits or vegetables

Common Pathways

  • show / hide
  • Plants for planting (except seeds bulbs and tubers)
  • Cut flowers or branches
  • Fruits or vegetables
  • Hitchhiking

Risk Ratings and Current Mitigations

Unmitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Current Mitigations

  • show / hide

Key mitigation for pest

Regulation

Surveillance

Industry Scheme

Contingency Plan

Awareness

Research

Mitigated Risks

Likelihood [1 - 5] 2
Spread [1 - 5] 2
Impact [1 - 5] 3
Value at Risk [1 - 5] 5
Likelihood x Impact [1 - 25] 6
UK Relative Risk Rating [1 - 125] 30

Proposed Actions

Proposed Actions

Regulation

Deregulation

Management By Industry

Targeted Survey

PRA

Contingency Plan

Publicity

Research

Distribution and Pest Details

Distribution

Country / Territory Status Notes
Europe
France Present
Spain Present
United Kingdom Absent
Italy Unknown Exact species present uncertain
North America
United States Present
South America
Argentina Present
Chile Present
Uruguay Present
Oceania
Australia Present
New Zealand Present
Africa
Tunisia Unknown Exact species present uncertain
Asia
Israel Present
Japan Present
South Korea Unknown Exact species present uncertain
Taiwan Unknown Exact species present uncertain

Type of Pest

  • Insect (Coleoptera)

Host or Industry at Risk

  • show / hide

Field and glasshouse vegetable crops

Major Hosts

  • Allium cepa L.
  • Apium graveolens L.
  • Brassica oleracea L.
  • Brassica rapa L. em. Metzg.
  • Daucus carota L.
  • Fragaria x ananassa (Duchesne ex Weston) Duchesne ex Rozier
  • Lactuca sativa L.
  • Lepidium L.
  • Solanum lycopersicum L.
  • Medicago sativa L.
  • Nicotiana tabacum L.
  • Petroselinum crispum (Mill.) Nyman Ex A. W. Hill
  • Raphanus sativus Linnaeus
  • Rubus idaeus L.
  • Rumex L.
  • Solanum tuberosum L.
  • Spinacia oleracea L.
  • Stellaria L.
  • Umbelliferae
  • Caryophyllaceae (family)
  • Solanaceae (family)
  • Asteraceae (family)
  • Brassicaceae (family)
  • Fabaceae (family)
  • Lamiaceae (family)
  • Polygonaceae (family)

Threats to Protected Cultivation

  • Both protected crops and outdoor production

Forest Tree Pests and Pathogens

Further Information

PRA Availability

UK (2004)

Regulation and EPPO listing

  • show / hide

Not currently listed

Actions Indicated

  • show / hide

Action

No statutory action.

General Comments

Polyphagous weevil native to South America but now found in several other parts of the world. This species is now regarded as distinct from the closely related Listroderes costirostris.

Further Information

Uncertainty

  • show / hide

Key uncertainty for pest

Taxonomic uncertainty between this species and L. costirostris

Climate

Current distribution

Hosts

Impact

Pathways

Regulation

Taxonomy

UK distribution

Risk Records for this Pest